Loerch, A. G.Muckstadt, J. A.2007-11-092007-11-091990-01887https://hdl.handle.net/1813/8770An Approach to Production Planning, Scheduling, and Due-Date Quotation in Cyclically Scheduled Manufacturing Systems4451929 bytesapplication/pdfen-USOperations ResearchIndustrial Engineeringtechnical reportAn Approach to Production Planning, Scheduling, and Due-Date Quotation in Cyclically Scheduled Manufacturing Systemstechnical report