eCommons

 

Workload Evolution on the Cornell Theory Center IBM SP2

Other Titles

Abstract

The Cornell Theory Center (CTC) put a 512-node IBM SP2 system into production in early 1995, and extended traces of batch jobs began to be collected in June of that year. An analysis of the workload shows that it has not only grown, but that its characteristics have changed over time. In particular, job duration increased with time, indicative of an expanding production workload. In addition, there was increasing use of parallelism. As the load has increased and larger jobs have become more frequent, the batch management software (IBM's LoadLeveler) has had difficulty in scheduling the requested resources. New policies were established to improve the situation. This paper will profile how the workload has changed over time and give anin-depth look at the maturing workload. It will examine how frequently certain resources are requested and analyze user submittal patterns. It will also describe the policies that were implemented to improve the scheduling situation and their effect on the workload.

Journal / Series

Volume & Issue

Description

Sponsorship

Date Issued

1996-06

Publisher

Cornell University

Keywords

theory center

Location

Effective Date

Expiration Date

Sector

Employer

Union

Union Local

NAICS

Number of Workers

Committee Chair

Committee Co-Chair

Committee Member

Degree Discipline

Degree Name

Degree Level

Related Version

Related DOI

Related To

Related Part

Based on Related Item

Has Other Format(s)

Part of Related Item

Related To

Related Publication(s)

Link(s) to Related Publication(s)

References

Link(s) to Reference(s)

Previously Published As

http://techreports.library.cornell.edu:8081/Dienst/UI/1.0/Display/cul.tc/96-244

Government Document

ISBN

ISMN

ISSN

Other Identifiers

Rights

Rights URI

Types

technical report

Accessibility Feature

Accessibility Hazard

Accessibility Summary

Link(s) to Catalog Record