Economics of Tunnel Ventilation for Freestall Barns

dc.contributor.authorGooch, C.A.en_US
dc.contributor.authorTimmons, M.B.en_US
dc.contributor.authorKarszes, J.en_US
dc.date.accessioned2014-07-16T13:51:17Z
dc.date.available2014-07-16T13:51:17Z
dc.descriptionA cash flow analysis of the application of tunnel ventilation to four standard freestall barn configurations was conducted with the objective of determining the amount of milk production required to be sustained based on a break-even investment. Other variables that are negatively affected by heat stress were not accounted for in the analysis due to the high degree of intangibility associated with them. Analysis showed that relatively little sustained production is required to pay for a tunnel ventilation system based on a 5-year payback period including areas of the country where tunnel fans would be used as little as 50 fan days per year (1,200 hrs.). This is a cash only basis analysis and does not look at actual economic rates of return, which is necessary for individual businesses to determine if this investment should be made based on their unique circumstances.en_US
dc.identifier.urihttps://hdl.handle.net/1813/36941
dc.language.isoen_USen_US
dc.subjectDairy housingen_US
dc.subjectTunnel ventilationen_US
dc.subjectHeat stressen_US
dc.subjectDairy profitabilityen_US
dc.titleEconomics of Tunnel Ventilation for Freestall Barnsen_US
dc.typearticleen_US

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
04101.pdf
Size:
95.54 KB
Format:
Adobe Portable Document Format