eCommons

 

Systems Engineering

Permanent URI for this collection

There is an increasing need in industry for engineers who not only have expertise in a particular engineering discipline, but who also possess diverse interdisciplinary skills.

At Cornell, we have aligned five of the world's most renowned engineering departments to create a Systems Engineering Program of unprecedented strength. This forms the core of our interdisciplinary approach, but our program is influenced by a host of additional fields within the College of Engineering and throughout the University.

For more information, go to the Systems Engineering Home Page.

Browse

Recent Submissions

Now showing 1 - 2 of 2
  • Item
    An Adaptive Workflow to Generate Street Network and Amenity Allocation for Walkable Neighborhood Design
    Yang, Yang; Samaranayake, Samitha; Dogan, Timur (Proceedings of the Symposium on Simulation for Architecture and Urban Design 2020, 2020-05)
    This paper proposes a novel generative workflow for walkable neighborhood design. Key components of the workflow include automating the process of parsing the map data, building contextual models with population and amenity data, conducting an integrated mobility simulation, and generating a street network and amenity allocation plan accordingly. The proposed framework is versatile and adaptive by allowing designers to tune simulation parameters and customize the decision-making process. The applicability and effectiveness of the workflow are tested in a pedestrian-oriented neighborhood design case study. Three scenarios that adapt to different design goals and boundary conditions are presented. This research equips designers with capabilities to co-design of mobility solutions and urban form early on in the design process. Further, it can be leveraged by more stakeholders in sectors such as real estate, public services, and public health to make decisions as the urban built environment has a fundamental impact on all these fields.
  • Item
    NONLINEAR OPTIMIZATION FOR PROJECT SCHEDULING AND RESOURCE ALLOCATION UNDER UNCERTAINTY
    Mahmoudoff, Ali (Cornell University, 2006-08)
    Project planning and scheduling when there are both resource constraints and uncertainty in task durations is an important and complex problem. There is a long history of work on deterministic resource-constrained project scheduling problems, but efforts directed at stochastic versions of that problem are fewer and more recent. Incorporating the ability to reallocate resources among tasks to change the characteristics of their duration probability distributions adds another important dimension to the problem, and enables integration of project planning and scheduling. Among the small number of previous works on this subject, there are two very different perspectives. Golenko-Ginzburg and Gonik (1997, 1998) have created a simulation-based approach that ?operates? the project through time and attempts to optimize locally regarding decisions on starting specific tasks at specific times. Turnquist and Nozick (2004) have formulated a nonlinear optimization model to plan resource allocations and schedule decisions a priori. This has the advantage of taking a global perspective on the project in making resource allocation decisions, but it is not adaptive to the experience with earlier tasks when making later decisions in the same way that the simulation approach is. Although the solution to their model produces a ?baseline schedule? (i.e., times when tasks are planned to start), the formulation puts much greater emphasis on resource allocation decisions. The paper by Turnquist and Nozick (2004) describes the problem formulation as a nonlinear optimization. For small problem instances (up to about 30 tasks), good solutions can be found using standard nonlinear programming packages(e.g., NPSOL). However, for larger problems, the standard packages often fail to find any solution in a reasonable amount of computational time. One major contribution of this dissertation is the development of a solution method that can solve larger problem instances efficiently and reliably. In this dissertation, we recommend using the partially augmented Lagrangian (PAL) method to solve the suggested nonlinear optimization. The test problems considered here include projects with up to 90 tasks, and solutions to the 90-task problems take about 2 minutes on a desktop PC. A second contribution of this dissertation is exploration of insights that can be gained through systematic variation of the basic parameters of the model formulation on a given problem. These insights have both computational and managerial implications for practical application of the model.