Cornell University
Library
Cornell UniversityLibrary

eCommons

Help
Log In(current)
DigitalCollections@ILR
ILR School
  1. Home
  2. ILR School
  3. Library
  4. Catherwood Library
  5. Key Workplace Documents
  6. Federal Publications
  7. Federal Publications
  8. Prevailing Wage Requirements and the Emergency Suspension of the Davis-Bacon Act

Prevailing Wage Requirements and the Emergency Suspension of the Davis-Bacon Act

File(s)
PrevailingWageRequirements.pdf (29.12 KB)
Permanent Link(s)
https://hdl.handle.net/1813/77725
Collections
Congressional Research Service (CRS) Reports and Issue Briefs
Federal Publications
Author
Luckey, John R.
Shimabukuro, Jon O.
Abstract

President Bush has, by proclamation, suspended the application of the Davis-Bacon Act to all contracts to be performed in the jurisdictions in Alabama, Florida, Louisiana, and Mississippi included in the Hurricane Katrina disaster area. This has the effect of permitting the payment of less than the locally prevailing wage on contracts entered into after September 8, 2005, for the construction or repair of public buildings and public works in the affected area. H.R. 3684 would make this type of suspension automatic for one year when a disaster is declared under the Robert T. Stafford Disaster Relief and Emergency Assistance Act.

Date Issued
2005-09-16
Keywords
prevailing wage
•
Davis-Bacon Act
•
construction
•
president
•
labor
•
suspension
•
repair
•
contract
•
disaster
Type
government record

Site Statistics | Help

About eCommons | Policies | Terms of use | Contact Us

copyright © 2002-2026 Cornell University Library | Privacy | Web Accessibility Assistance